CASE STUDIES
|
Ground Source
Wellington Business Park – design, supply and installation of the heating and cooling system to the 2-storey office block that will be fuelled by a ground source closed loop heat pump |
| |
|
|
Biomass – CHP
Guy’s and St Thomas’ Hospitals London - the design, supply and installation of the combined heat and power generating set acoustic enclosure and associated ventilation |
| |
|
|
Solar
St Jerome’s School - incorporates the boilers and associated equipment, solar hot water system, rainwater collection and reuse system, airconditioning and electrical systems |
| |
|
|
Wind
Whitlee Windfarm – a solution had to be found to reduce noise levels to prevent the windfarm from contravening the terms of its planning consent.
Image is attached |
| |
|
|
CHP
University of Wales - The CHP installation should meet a large part of the normal site base electrical demand and reduce the overall cost of imported electricity
Image is attached |
|
|
Latest News
The latest news from Kimpton
• A sound solution for meeting carbon reduction targets...click here
Case Studies
• Guy’s and St Thomas’ Hospitals London...click Here
• University of Wales Hospital, Cardiff...click Here
• St Jerome’s School ...click Here
• Wellington Business Park...click Here
• Whitlee Windfarm...click Here |