gray line
 
Kimpton Building Services

tel: 0151  343  1963 email: renewables@kimpton.ltd.uk


spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer

 

CASE STUDIES

GROUND SOURCE ENERGY CASE STUDY

Ground Source

Wellington Business Park – design, supply and installation of the heating and cooling system to the 2-storey office block that will be fuelled by a ground source closed loop heat pump

   
BIOMASS CASE STUDY

Biomass – CHP

Guy’s and St Thomas’ Hospitals London - the design, supply and installation of the combined heat and power generating set acoustic enclosure and associated ventilation

   
SOLAR ENERGY CASE STUDY

Solar

St Jerome’s School - incorporates the boilers and associated equipment, solar hot water system, rainwater collection and reuse system, airconditioning and electrical systems

   
WIND CASE STUDY

Wind

Whitlee Windfarm – a solution had to be found to reduce noise levels to prevent the windfarm from contravening the terms of its planning consent.
Image is attached

   
CHP CASE STUDY

CHP

University of Wales - The CHP installation should meet a large part of the normal site base electrical demand and reduce the overall cost of imported electricity
Image is attached

 

 

line

Latest News

The latest news from Kimpton

• A sound solution for meeting carbon reduction targets...click here

Case Studies

Guy’s and St Thomas’ Hospitals London...click Here

University of Wales Hospital, Cardiff...click Here

St Jerome’s School ...click Here

Wellington Business Park...click Here

Whitlee Windfarm...click Here





For more information ring 0151 343 1963 or email enquiry@kimpton.ltd.uk